Evaporation retrofit, new stages (Klabin)
Piping and E&I detailing for a double-effect evaporation installation.
Request a proposal by e-mail
Project summary
| Sector | Pulp & paper | Company | Metso & Klabin |
|---|---|---|---|
| Location | Telêmaco Borba – PR | Approximate investment | Not disclosed |
| Project no. | OS 022 | Scope |
|
The main challenge
The double effect needed transfer and recirculation pumps under the equipment, and steam lines had to run much longer distances.
That meant more supports in places not prepared for those loads. The electrical room, where the ducts would pass, was not strong enough for the new load, so structural ties were created and anchored to the existing columns. New supports over 15 m high were also designed, with special bases for the long span.
Key success indicators
| Equipment installed successfully |
| Structural solution to wrap and reinforce the electrical room judged satisfactory |
Engecell's challenges
| Installing the equipment far from the other effects |
| Installing large steam ducts |