MVR evaporation — revamp, Klabin Telêmaco Borba
Detailed electrical and instrumentation design, erection supervision and start-up follow-up.
Request a proposal by e-mail
Project summary
| Sector | Pulp & paper | Company | Andritz & Klabin |
|---|---|---|---|
| Location | Telêmaco Borba – PR | Approximate investment | US$ 10 million |
| Scope |
| ||
The main challenge
Engecell detailed the electrical and instrumentation disciplines, hired by Andritz, which supplied the equipment and the mechanical design, including piping.
From the start we looked for support solutions that reused as many existing mechanical supports as possible, cutting total cost and freeing circulation space. With Engecell supervising erection, every agreed deadline was met and the new unit started during the scheduled general shutdown, even with more rain than expected.
Key success indicators
| Project delivered on time for the start-up date at the general shutdown |
| Specialized labor, ensuring quality and client satisfaction |
| Support solutions maximized, lowering the total cost of the project |
Engecell's challenges
| A short time from design to start-up: 5 months in total |
| Meeting the demands of the contractor (Andritz) and the end client (Klabin) within the agreed budget |