MVR evaporation — revamp, Klabin Telêmaco Borba

Detailed electrical and instrumentation design, erection supervision and start-up follow-up.

Request a proposal by e-mail
3D model of the evaporation unit

Project summary

SectorPulp & paperCompanyAndritz & Klabin
LocationTelêmaco Borba – PRApproximate investmentUS$ 10 million
Scope
  • Detailed electrical and instrumentation design
  • Supervising the erection contractor on all E&I work
  • Follow-up of the new unit's start-up

The main challenge

Engecell detailed the electrical and instrumentation disciplines, hired by Andritz, which supplied the equipment and the mechanical design, including piping.

From the start we looked for support solutions that reused as many existing mechanical supports as possible, cutting total cost and freeing circulation space. With Engecell supervising erection, every agreed deadline was met and the new unit started during the scheduled general shutdown, even with more rain than expected.

Key success indicators

Project delivered on time for the start-up date at the general shutdown
Specialized labor, ensuring quality and client satisfaction
Support solutions maximized, lowering the total cost of the project

Engecell's challenges

A short time from design to start-up: 5 months in total
Meeting the demands of the contractor (Andritz) and the end client (Klabin) within the agreed budget